Next weekend we're tearing apart our DR site, putting it in a van and moving to a new site where we'll re-assemble it. The WAN connectivity's the same (ie bandwidth) and the IP address haven't changed. The process will take 2 days (disassemble on Saturday, re-assmble on Sunday).
As far as SRM is concerned all I intend to do is shut down the DR site VCENTER server that runs the DR SRM instance then shutdown the ESX servers. At the new site reverse the process. My SRM \ vSphere databases are on a seperate sql server.
Can anybody see any problems with this?
Thanks
Andrew