Hi All,
Ive doing my eval before going into production.
Basically I've got a couple of HP EVA 6400 running with some HP Blades in a C7000 enclosure.
SRM installed and working for a DR Failover.
Now the manual for the SRA for the EVA's says to reconfigure srm and perform a failover for failback.
so dr secenario for SRM is Protected Site A -> Recovery Site B
for fail back reconfigure SRM so Recovery Site A <- Protected Site B and then do a failover.
then reconfigure back to its origonal configuration of Protected Site A -> Recovery Site B
Now this is good.. and works.. But a lot of messing around reconfiguring SRM for failbacks.
I'd like to at least automate the reconfiguring of SRM.. Has anyone done any powershell scripts to confiure SRM Creating/Deleting proection groups and recovery plans.
Or has anyone done a script that manually does a failback and the necessary cleans ups srm on EVA's
Thanks